Oil and Gas PDT™
Back to Products

Oil and Gas PDT™

The complete Project Development Toolkit for oil & gas upstream projects. Technical calculators, AACE-compliant cost estimation, and investment-grade financial analysis—all in one powerful platform.

Technical EstimationCost EngineeringFinancial Analysis
1

Technical Estimation Module

22 industry-standard calculators organized into 6 categories. The Platform Concept & Sizing category includes quick conceptual estimators for Fixed Platforms, FPSOs, FLNGs, FSRUs, and other floating units—providing detailed technical specifications and cost estimates with minimal inputs. All calculators feature automatic cost calibration based on real-world reference projects.

Separator Sizing
Heat Exchanger Design
Pump Calculations
Compressor Systems
Gas Processing
Water Treatment
Power Generation
Electrical Systems
HVAC & Buildings
Safety Systems
Instrumentation & Control
Valves & Piping
Subsea Production
LNG Processing
LPG Processing
Oil Treatment
Flowlines & Risers
Well Design
Artificial Lift
Drilling Operations
Well Intervention
Floating Units
2

Cost Estimation Module

AACE-compliant work breakdown structure with integrated scheduling. Import equipment costs directly from Technical Estimation, apply location factors, and track confidence levels across your entire project.

AACE-compliant Work Breakdown Structure
3-level hierarchical cost organization
Day Rate, Lump Sum, Unit Price methods
CEPCI cost escalation factors
Location multipliers (global coverage)
500+ cost database items
Confidence level tracking
Contingency calculation
Tax handling and mark-ups
1. Platform Construction - $145M
1.A Engineering$12M
1.B Fabrication$89M
1.C Hook-up$44M
Contingency (15%)$21.75M
3

Financial Modeling Module

Investment-grade economics with Monte Carlo simulation, real options valuation, and project finance modeling. Full LNG value chain support and multiple fiscal regime configurations.

Net Present Value (NPV)
Internal Rate of Return (IRR)
Modified IRR (MIRR)
Payback Period Analysis
Discounted Payback
Profitability Index
Monte Carlo Simulation (100K iterations)
Sensitivity Analysis
Tornado Diagrams
Real Options Valuation
Project Finance Modeling
Debt Service Coverage Ratio
Loan Life Coverage Ratio
Arps Decline Curves
LNG Value Chain
Multiple Fiscal Regimes
STRONG GO
$847M
NPV @ 10%
24.3%
Project IRR
3.2 yrs
Payback
87%
P(NPV > 0)

Ready to streamline your project development?

Join industry professionals using Oil and Gas PDT™ for technical sizing, cost estimation, and financial analysis.