Smart Energy. Robust Solutions.
Conceptual engineering screening in hours, not weeks.
Engineering-driven screening for upstream developments — physics-based sizing that produces the auditable cost build-up, the economics, and an execution-ready baseline. AACE Class 5 by design.
Three products, one auditable platform
Cost estimation, project controls and authorisation for upstream energy — integrated across the full development lifecycle.
Oil and Gas PDT™
Comprehensive technical calculators, cost estimation, and financial analysis for oil and gas upstream projects. From equipment sizing to Monte Carlo simulations.
Verified standards-based calculators
Equipment sizing for separators, pumps, heat exchangers, compressors, subsea systems, and more
AACE Cost Estimation
Industry-standard WBS-based cost breakdowns with contingency analysis
Financial Modelling
NPV, IRR, Monte Carlo simulations, and sensitivity analysis
Energy Projects Management
Unified project management platform for energy portfolios. Track projects, manage resources, and optimise capital allocation across your organisation.
Project Tracking
Milestone tracking, Gantt charts, and progress reporting
Portfolio Optimisation
Capital allocation and project prioritisation tools
Resource Management
Team allocation, workload balancing, and capacity planning
AFE Management
Streamline your Authorization for Expenditure workflows with intelligent approvals, real-time cost tracking, JV partner balloting, and a SOX-compliant audit trail.
AFE Lifecycle
End-to-end AFE management from creation through close-out with full audit trail
Intelligent Approvals
Multi-level approval routing with delegation, escalation, and conditional logic
Rhino Copilot — coming soon
Rhino Copilot will bring cost benchmarking, anomaly detection and predictive estimates to AFE — coming soon
From equipment sizing to the investment decision
Three modules in one continuous workflow: technical sizing feeds the cost build-up, the cost build-up feeds the economics — all auditable end to end.
Technical Estimation
Industry-standard equipment sizing tools with integrated cost estimation. Each calculator provides detailed datasheets, design warnings, and automatic cost calibration based on real-world reference projects.

Cost Estimation
AACE-compliant work breakdown structure with integrated scheduling. Import equipment costs directly from Technical Estimation, apply location factors, and track confidence levels across your entire project.
Work Breakdown Structure
3-level hierarchical WBS with industry-standard coding and cost roll-up
Flexible Cost Basis
Day Rate, Lump Sum, and Unit Price methods with tax handling
Benchmarked Cost Database
Comprehensive database with RICEI escalation and confidence ratings

Financial Modelling
Investment-grade economics with Monte Carlo simulation, real options valuation, and project finance modelling. Full LNG value chain support and multiple fiscal regime configurations.

This isn't a marketing animation. It's the physics.
The same Darcy-Weisbach solver that runs inside the platform — change the inputs and watch the sizing, Reynolds regime and pressure drop update live.
- Standards-cited across the full upstream scope (API, ASME, TEMA, AACE)
- Every calculation carries a complete, exportable audit trail
- P10 / P50 / P90 cost basis on every sized item
Subsea Pipe Sizing
Built for Professional Teams
Every product in the Rhino Intelligence suite shares a common platform with enterprise-grade features, security, and compliance built in from day one.
Enterprise Security
Role-based access control, session management, and secure data handling.
Real-Time Calculations
Instant results with live updates as you modify parameters.
Professional Reports
Export to PDF, Excel and PowerPoint for gate packages and presentations.
Audit Trail
Complete change tracking and assumption documentation.
Global Location Factors
Cost adjustments for Gulf of Mexico, North Sea, West Africa, and more.
Industry Standards
Our calculations and methodologies follow recognised industry standards
Built by an upstream engineer — for upstream engineers
Rhino is built by Juan Martinez, a project development engineer with over nine years in oil and gas — on both the contractor and operator side, across a range of project types and regions. Concept selection, AACE-aligned cost estimation and the NPV business cases that inform investment decisions are his day job. Rhino is the tool he wanted on every screening study.
MSc Energy Economics & Finance (Aberdeen) · BSc Petroleum Engineering · PMP®
Independent concept screening, cost-estimate reviews, and technical due diligence — delivered by the team behind the platform, with decision-support deliverables your committee can audit.
Replace disconnected spreadsheets with one auditable workflow.
From equipment sizing to the investment decision — physics-based, standards-cited and auditable end to end. Start a free trial, or book a demo for your team.